Construction of Aravi AruBridge in Arrippu on Thallady Arippu Marrichchukaddi Road (B-403)

  • Year:

    2010
  • Location:

    Arrippu
  • Category:

    Bridge Construction
  • Worth:

    Rs. 64 Mn
  • Share

About Project

The Aravi Aru Bridge was constructed across Malwathu Oya at Arippu on Thallady – Arippu – Marichchukadi Road (B403). The bridge consisted of six spans, totaling 256m in length and 7.35m wide steel deck structure. The foundation of the bridge consisting of bored piles were erected on bed rock up to the pile caps and the bridge piers of reinforced concrete were casted from the pile caps to bridge deck beams.