About Project

The circular intake concrete structure of capacity 100,000 cubic meters per day of the Unnichchai reservoir was constructed to convey raw water to the purification plant. An access bridge, Balancing tank, Canal formed with rock blasting was constructed to carry the distribution mains to the surge tank and to serve as access to the intake tower from LB end of the tank bund.