Anchorage Facility at Maradana Landing Site in Beruwala

  • Year:

    2014
  • Location:

    Beruwala
  • Category:

    Maritime Construction
  • Worth:

    62 Mn
  • Share

About Project

The project was proposed to construct a new fishery harbor at Maradana – Beruwala having capacity of 400 one-day and multi-day boats which was consisting a 240m long breakwater and 50m long groyne. 60,000 ton of rock was used for the construction work and it was included a 20,000m³ dredging work too.