Bridges

Bridge pic 1.png

01

Unnichchai Tank Central Spill Bridge

The works included demolishing of existing bridge deck piers, deck and construction of wider pier on the raised central spillway to accommodate a motorable bridge for heavy vehicles.The bridge consisted of pre-stressed pre cast beams of 6m span to form a 174m length of bridge.

02

Construction of Aravi Aru Bridge in Arrippu on Thallady Arippu Marrichchukaddi Road (B-403)

The Aruvi Aru Bridge was constructed across Malwathu Oya at Arippu on Thallady – Arippu - Marichchukadi Road (B403).

The bridge consisted of six spans, totaling 256m in length and 7.35m wide steel deck structure.The foundation of the bridge consisting of bored piles were erected on bed rock up to the pile caps and the bridge piers of reinforced concrete were casted from the pile caps to bridge deck beams.

Bridge pic 2.png
Bridge pic 3.png

03

Steel Bridge at Weras Ganga Storm Water Drainage & Environment Improvement Project

This is an emergency bridge at Weras Ganga Storm Water Drainage & Environment Improvement Project to connect the main water stream of the North Canal

with Weras Ganga main canal.